-
A Normal sample needs 3 to 7 days, a 20 GP needs 20-25 days, a 40 HQ needs 25-30 days after deposit received. But if it is an urgent order, we will try our best to reduce the time.
-
A Small order time for stocked product is about 7days,Mass production time is 35-45days according to the order quantity.
-
A 7-45 days after confirm samples and receive 30% deposit.
-
A Normally 3~30 days, due to different capacity and color.
-
A It takes 10-15 days for MOQ. We have large production capacity, which can ensure fast delivery time even for large quantity.
-
A We have spare parts stocks for most items. 3-7days for sample or small orders, 15-35 days for a 20ft container.